Notice from Operations & Facilities

Numbering system installation update
Over the summer O&F was able to install the newly designed room numbering system. Please note, the conversion process will not be completed prior to the end of fall semester registration.
What this means:
- ALL CLASSROOM & LAB LOCATIONS will utilize OLD room numbers which will match student schedules. These locations will have tape over the new signs to display the OLD room numbers. Please do not remove.
- Most offices, mechanical rooms, storage closets, etc. will utilize NEW signage/numbering system. When issuing out your syllabus for this semester – please use your NEW office number.
For those impeded by the new construction on second floor – O&F will have the new office numbering system in place as soon as possible.
O&F plans to switch to the new numbering system before spring registration opens. At that time, Wayne Wests occupants will be notified and new building maps will be distributed.
Social Share
Upcoming Events
15
April
2026
Repeating Event
Wayne West 205
27
April
2026
Repeating Event
Wayne West 104




